Saturday, 26 September 2009

1 September 09



Petrol stop in Switzerland.

The long tunnels were intimidating.

Lunch stop at Lake Maggiore.

Boat haul out eyelet bolts shear off and the boat attempts to twist itself off the trailer on bumpy roads.

Arrive at Venice base, Fusina campsite very late after Jane (sat nav) freaked out at the new Venice motorway system.  Spent 2 hours trying to get off the motorway.

No comments:

Post a Comment